Job Board
LogoLogo

Get Jobs Tailored to Your Resume

Filtr uses AI to scan 1000+ jobs and finds postings that perfectly matches your resume

Turner & Townsend Logo

QA/QC Engineer - Data Center Construction

Turner & Townsend

Salary not specified
Aug 13, 2025
Avondale, AZ, USA
Apply Now

Turner & Townsend is hiring a QA/QC Engineer to ensure the quality and compliance of data center construction projects, delivering high-performance facilities that meet the highest standards of quality and reliability.

Requirements

  • 3–5 years of experience in QA/QC roles, preferably in data center or mission-critical construction environments.
  • Strong understanding of construction processes, QA/QC principles, and industry standards (e.g., ISO 9001).
  • Familiarity with quality standards and data center construction requirements is a plus.
  • Proficiency in quality management software and Microsoft Office tools.
  • Ability to read and interpret construction drawings, specifications, and technical documents.
  • Certified Quality Engineer (CQE), Certified Construction Manager (CCM), Six Sigma, or equivalent is preferred.

Responsibilities

  • Develop and implement project-specific QA/QC plans, inspection checklists, and quality documentation.
  • Review and approve Material Technical Data Sheets (MTDS) for compliance with project specifications.
  • Prepare and submit Method Statements, Inspection and Test Plans (ITPs), and Quality Control Procedures.
  • Conduct regular on-site inspections and tests on materials, equipment, and construction activities.
  • Ensure compliance with design documents, contract requirements, and applicable codes and standards.
  • Identify and document non-conformances (NCRs); implement corrective and preventive actions.
  • Track quality metrics and provide regular reports to stakeholders on quality performance.

Other

  • Bachelor’s degree in Civil, Mechanical, Electrical Engineering, Construction Management, or a related field.
  • Excellent attention to detail, analytical thinking, and communication skills.
  • Willingness to travel to various data center construction sites as required.
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable.